Pasco County drivers are facing a busy week of construction delays as the Florida Department of Transportation District 7 rolls out its maintenance and construction schedule for June 21 through June 27, 2026. The planned work spans major highways, state roads, and local connectors, bringing a mix of overnight lane restrictions, daytime flagging operations, and long-term, round-the-clock closures.
Affected Routes
Commuters relying on Interstate 75 will see nighttime disruptions at Exit 285 to State Road 52. From Sunday, June 21 through Thursday, June 25, one of the two lanes on the ramp will close each night between 8 p.m. and 6 a.m., though turns will remain available in both directions.
Nearby, State Road 52 itself will see night closures from west of I-75 to Tradeway Boulevard and Pasco Road during those same hours. Additionally, several long-term 24/7 closures are now in place on State Road 52, including the westbound left lane near the Suncoast Parkway (State Road 589) and a partial closure of the eastbound left-turn lane onto northbound State Road 589.
Major US routes through the county are also heavily impacted. On US 41 (Land O’ Lakes Boulevard), daytime lane closures are scheduled at Lake Patience Road from Monday, June 22 through Friday, June 26, running from 8 a.m. to 6 p.m. daily.
Original reporting: Tampa Free Press — read the source article.