THE YOUR

Close to home. Always in the loop.

WYDOT Schedules Maintenance on Snake River Bridge in Jackson

The Wyoming Department of Transportation (WYDOT) has announced that follow-up maintenance work on the Snake River Bridge on WY22 in Jackson is set to begin on Monday, June 8. This essential work is expected to last for three days, weather permitting, and will involve applying an epoxy overlay and welding snow plates on the expansion devices for both abutments.

Impact on Local Traffic

Commuters should prepare for lane closures in both directions during the daytime hours as the epoxy requires favorable temperatures to set properly. The initial day of work will focus on the epoxy overlay, while the subsequent two days will address the expansion devices.

WYDOT has urged drivers to exercise caution, put their phones down, and adhere to all roadside signs and closures to ensure safety during this period. For the latest updates on road status and driving conditions, residents are encouraged to visit the WYDOT travel map.

Community Awareness

The maintenance work on the Snake River Bridge is a crucial part of ensuring the safety and reliability of local infrastructure. Such projects highlight the importance of maintaining public works to support the community’s daily life and commute.


Original reporting: Buckrail (Jackson WY) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News