The Your
Aug 28, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

John H. Kinzie Elementary Closed for Mold Testing; Students Relocated to Kennedy High

Garfield Ridge families are adjusting to an unexpected start to the school year as Chicago Public Schools (CPS) closed John H. Kinzie Elementary on Thursday due to suspected mold on the building’s first floor. The district has moved the school’s 600 students to the adjacent John F. Kennedy High School while an independent environmental consultant conducts thorough mold‑clearance testing.

Testing and Safety Measures

According to CPS spokespersons, the suspected mold appears to be the result of condensation from pipe leaks during the summer’s high humidity. The facilities department is taking “additional steps to ensure the school’s safety,” and the building will remain closed through Friday, the district said, “out of an abundance of caution.”

Principal Adriana Ortiz informed parents on Thursday that mold and peeling paint had been reported, and on Sunday night she confirmed the relocation to Kennedy High. She emphasized that the district is partnering with an independent consultant to test each classroom and that the school will only reopen once all results confirm a safe environment.

Impact on Students and Parents

While classes continue on a normal schedule (7:30 a.m. – 2:30 p.m.), many students are learning in unconventional spaces, including outdoor areas and the high school’s auditorium ramps. Parents expressed concern about lost instructional time. Garfield Ridge resident Jennifer Sandoval, whose second‑grade daughter attends Kinzie, said her child “hasn’t started learning” and spends much of the day “sitting around or playing outside.” She worries about reading progress and the broader disruption to the start of the academic year.

Sandoval also reported a registration issue for her younger daughter’s kindergarten enrollment. Because Kinzie remains closed, she has been unable to obtain the necessary paperwork, and the school’s administration told her the matter is out of their control until the building reopens.

Facilities Department Response

Ortiz praised the Department of Facilities for its rapid response and for adding a mechanical exhaust system designed to remove moisture and prevent future mold growth. The district’s facilities team is also upgrading ventilation and drainage systems, improving automation controls, and installing real‑time indoor‑air‑quality monitors throughout the school.

“The safety and well‑being of students and staff is a top priority at Chicago Public Schools,” the district spokesperson said. “Every student and staff member deserves a safe, clean, welcoming teaching and learning environment.”

What’s Next?

The independent testing is expected to be completed by early next week. If results are favorable, Kinzie Elementary will reopen; otherwise, CPS will continue to keep the building closed while additional remediation work is performed. In the meantime, families are encouraged to stay in contact with school officials for updates on class locations and any further safety measures.

Community members can follow CPS announcements on the district’s website or through direct communications from Kinzie’s administration. The situation underscores the importance of vigilant facility maintenance and swift action to protect children’s health and education.


Original reporting: Block Club Chicago — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →