The Your
Oct 16, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Eckert Road Bridge Closure Extends Through 2028, Detours Routed via Parkcenter Blvd and Bown Way

Residents of southeast Boise should plan for a long‑term detour after the Eckert Road Bridge was closed on Monday, Oct. 12. The Ada County Highway District (ACHD) says the bridge will remain out of service until the fall of 2028 while a full replacement and associated roadway upgrades are carried out.

Detour routes for motorists

ACHD recommends that drivers travel on Parkcenter Boulevard and Bown Way to bypass the closed crossing. The stretch of Eckert Road between Boise Avenue and Millbrook Way is now limited to local traffic only, so commuters should allow extra travel time as traffic adjusts to the new patterns.

Why the bridge is being replaced

Inspections revealed serious decay in multiple support pillars, prompting an early 2025 closure for safety reasons. Rather than patch the existing structure, the district has opted for a complete replacement. The project includes a wider bridge over the Boise River, a new crossing over the Ridenbaugh Canal, and a roundabout at Eckert Road and Boise Avenue. A multi‑use pathway will run along the west side of the bridge, and a Greenbelt tunnel beneath will improve pedestrian and cyclist access.

Barber Park stays open

Families who frequent Barber Park can breathe a sigh of relief: the park will remain open throughout construction. ACHD confirms that access from the Boise Avenue side will be maintained via a temporary bypass over the Ridenbaugh Canal, and parking will continue to be available.

Project timeline and future benefits

The construction will be phased, beginning with the bridge replacements. Once those are reopened, crews will move on to the intersection improvements at Eckert Road and Boise Avenue. Although the overall schedule extends to 2028, the district expects that the finished project will deliver a safer, more convenient crossing for drivers, cyclists and pedestrians, as well as a modernized intersection and enhanced green‑space connectivity.

Where to find updates

For the latest detour information, project milestones and any changes to traffic patterns, residents should visit the ACHD Eckert Road Bridge and Intersection Project page.


Original reporting: 580 KIDO Talk Radio (Boise) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →