Colorado Springs, CO – Colorado Springs Utilities announced that the final phase of the Galley Road Water Main Improvement Project will resume on Monday, Nov. 30. The work, which is part of a broader effort to strengthen the city’s water infrastructure, will involve temporary traffic adjustments and a brief closure of a portion of Babcock Road.
Construction schedule and traffic impacts
Starting Nov. 30, crews will operate with one lane open in each direction on Galley Road between Wooten Road and Babcock Road. Beginning Dec. 7, Babcock Road will be closed between Galley Road and Geiger Boulevard. Drivers are asked to use Wooten Road and Geiger Boulevard as a detour while the work proceeds.
The construction window is projected to last roughly two weeks, weather permitting. Utilities officials emphasized that the temporary lane reductions are necessary to safely complete the installation and that signage and flaggers will be on site to guide motorists.
Project details and long‑term benefits
The project focuses on connecting a new, upgraded water main to the existing distribution system. By employing a structural lining process, the utility will reinforce the existing pipeline, extending its service life without the need for a full pipe replacement. This method not only reduces costs but also minimizes disruption to residents compared with a complete pipe swap.
According to Springs Utilities, the upgraded main will improve long‑term water service reliability and add system redundancy. In the event of a pipe failure elsewhere in the network, the reinforced segment will help maintain pressure and supply to homes and businesses along the Galley Road corridor.
Community response and next steps
Local residents and business owners have expressed appreciation for the utility’s communication plan, which includes advance notice of lane closures and clear detour routes. The utility has also set up a dedicated phone line and email address for any questions or concerns related to the project.
Utilities officials will monitor weather conditions closely, as severe cold or precipitation could affect the construction timeline. Should delays become necessary, the utility will issue updates through its website, social media channels, and local news outlets.
How to stay informed
Colorado Springs residents can stay up to date on the project’s progress by visiting the Colorado Springs Utilities website or downloading the KRDO13 app, available on the Apple App Store and Google Play. The app provides real‑time traffic alerts, construction updates, and other local news relevant to the community.
By completing this final phase, Colorado Springs Utilities moves one step closer to ensuring a resilient water system that can meet the needs of a growing city while preserving the safety and convenience of its neighborhoods.
Original reporting: KRDO (Colorado Springs metro) — read the source article.