Construction crews will continue work on a multi-year maintenance project in Buellton, resulting in lane reductions along northbound and southbound Highway 101. Beginning on Monday, June 8, travelers through Buellton will be reduced to one-lane in each direction. The #2 (right lane) will be closed in both directions, resulting in a reduction to a single lane.
Project Details
This closure will extend from the Nojoqui Creek Bridge to just north of Avenue of Flags and Damassa Road. The Santa Rosa Road northbound and southbound ramps, along with the northbound Damassa Rd. off ramp, will be closed for approximately three months for reconstruction and bridge safety upgrades. Drivers should use the Hwy 246 ramps as a signed detour during this period.
Travelers are advised to plan accordingly and anticipate possible delays of up to 10 minutes. This work is part of a project to maintain roughly ten miles of US 101, in addition to the reconstruction of shoulders, replacement of concrete pavement, overlaying of existing asphalt, ramp reconstruction, drainage repair work, electrical upgrades, and the installation of new guardrails throughout this segment.
Additional Traffic Control
Travelers on Highway 1 north of Guadalupe will encounter one-way reversing traffic control at the Santa Maria River Bridge continuing Monday, June 8. Traffic control will be in effect from 8 am to 5 pm Monday thru Thursday. The crew will be providing a temporary detour along a temporary alignment to allow for the continued construction of the Santa Maria River Bridge Replacement project.
Original reporting: KEYT (Ventura/Santa Barbara) — read the source article.