Jun 12, 2026
The Your

Close to home. Always in the loop.

Gold Star Bridge Construction

Ambulance crews in southeastern Connecticut are preparing for potential traffic delays due to ongoing construction on the Gold Star Bridge, a critical route for emergency medical transports between communities and New London hospitals.

Backup Plans in Place

For Mystic River Ambulance, the bridge is an important link in patient care. The service responds to eight to 10 calls a day, with about two-thirds of patients transported to Lawrence + Memorial Hospital in New London. Without traffic, the trip from Mystic to Lawrence + Memorial Hospital takes about 15 minutes. If congestion or a bridge closure prevents crews from reaching the hospital, they can instead transport patients to Pequot Health Center in Groton, which is located east of the Thames River and does not require crossing the bridge.

Mystic River Ambulance Association President Todd McDonnell said emergency responders have long prepared for that possibility. “It’s always been a choke point. There’s always been the possibility of a wreck,” said McDonnell. “We’ve always had these plans in the back of our mind. This is not something new.”

McDonnell said ambulance services have multiple backup options available. In addition to Pequot Health Center, Mystic River Ambulance can transport patients to Westerly Hospital or Backus Hospital in Norwich when needed. Similar ambulance services, including Groton Ambulance and North Stonington emergency responders, have developed comparable contingency plans.


Original reporting: NBC Connecticut — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News