The Your
Oct 28, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Bedford Toll Project Advances as Canopy Comes Down

The New Hampshire Department of Transportation (NHDOT) announced today that the long‑awaited toll removal project in Bedford is moving forward at a steady pace. Crews have taken down the large canopy that once covered the toll plaza, and roughly 40% of the remaining concrete slabs, islands and booths have been demolished.

Why the project matters to Bedford families

For years, the toll plaza on I‑95 has been a source of congestion and safety concerns. Several accidents were traced to the outdated booth configuration, prompting state officials to replace the manual system with modern electronic tolling. The shift promises smoother traffic flow, reduced travel times, and a safer driving environment for commuters and local residents alike.

What’s next for the roadway

Work will continue throughout the winter months. NHDOT teams plan to finish demolition, install drainage improvements, and prepare the roadway for the next phase of construction. In the spring, crews will begin paving the former toll area, install a median barrier, and re‑channel traffic toward the center of the highway. These steps are designed to ensure a seamless transition to the new electronic system and to protect the roadway from future wear.

Timeline to completion

The department has set a target of September 2027 to fully complete the project. By that date, the old toll infrastructure will be gone, and drivers will no longer need to stop for cash or card payments. Instead, the electronic system will automatically bill registered vehicles, a method already proven effective in other New Hampshire corridors.

Community response

Local residents have expressed relief that the hazardous booths are being removed. Many families appreciate the anticipated reduction in traffic backups during rush hour, which often disrupted school runs and daily errands. Business owners along the corridor also welcome the smoother flow of customers and deliveries.

State support and funding

The project is funded through a combination of state transportation funds and federal infrastructure grants. NHDOT officials emphasized that the investment reflects a broader commitment to modernizing New Hampshire’s highways while preserving the safety and convenience of its citizens.

As the work progresses, the department will provide regular updates to the public through its website and local news outlets. Bedford motorists are encouraged to stay informed about temporary lane changes and detours that may occur during construction.


Original reporting: WMUR (Hearst) – local news — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →