The Your
Nov 17, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Trump administration faces $275 million shortfall for Tijuana River treatment plant expansion

The International Boundary and Water Commission (IBWC) announced a $275 million funding shortfall for the expansion of the International Wastewater Treatment Plant that serves Tijuana, raising concerns for San Diego residents who rely on the plant to prevent sewage spills into the Tijuana River and the Pacific Ocean near Imperial Beach.

According to Voice of San Diego, the plant—built in the 1990s with binational funds—is slated to double its capacity under a plan the Trump administration says will “slash roughly 12 years of construction” and permanently end the sewage crisis. The administration pledged to complete the capacity‑doubling construction by Dec. 31 2027.

Dave Gibson, executive director of the San Diego Regional Water Quality Control Board, told the board that the IBWC is $275 million short of the nearly $1 billion needed for the upgrade. The shortfall pushes the total project cost to “almost $1 billion,” Gibson said.

MaryAnne Pintar, chief of staff for Rep. Scott Peters, noted that Congress previously secured $310 million in emergency funds for unexpected repairs and added, “We all jumped through circus hoops to get it and now they’re telling us they need this much more.” She said the higher cost reflects President Trump’s expectation that the plant treat double the sewage volume by the end of 2027.

Gibson said he told IBWC commissioner Scott McIntosh “five times” that the board expects the expanded plant to be in compliance with the Clean Water Act by 2030. The IBWC declined to comment, and spokesperson Frank Fisher said he had not received clearance to speak.

Without the expanded plant, up to 35 million gallons of sewage per day could flow untreated into the Tijuana River, threatening water quality for beachgoers in Imperial Beach and residents downstream. The Trump administration’s accelerated schedule aims to protect those communities.

What’s next: The IBWC is expected to seek additional federal appropriations to cover the $275 million gap, while local officials will monitor progress toward the Dec. 31 2027 deadline and the 2030 Clean Water Act compliance target.


Sources: voiceofsandiego.org

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →