The Your
Oct 28, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

St. Pete Beach Commissioners Approve $1.5 Million Sewer Lift Station Upgrades

St. Pete Beach commissioners voted unanimously on Tuesday to move forward with a $1.5 million public‑works project that will modernize three sewage lift stations damaged by Hurricanes Helene and Milton in 2024. The upgrades, which include elevating electrical controls above flood levels and installing permanent backup generators, are designed to keep wastewater flowing during future storms and protect the city’s vital tourism economy.

Project details and timeline

The city’s wastewater utility will fund the work, which covers Lift Station 7 at Belle Vista Triangle Park ($514,000), Lift Station 10 at Fisherman’s Park near Corey Avenue ($541,000), and Lift Station 4 near Pass‑a‑Grille Marina ($500,000). Each structure will stand roughly 13 to 14 feet tall, with generators mounted on elevated platforms to stay above the base flood elevation.

Construction contracts were already in place, and the projects are slated for completion by July 2027. As of September, St. Pete Beach reported that 98.5 % of its wastewater pipes and 85 % of its manholes have been cleaned and inspected, identifying additional maintenance needs.

Community concerns and compromises

While the upgrades are widely recognized as essential, some residents have voiced concerns about the visual impact of the new structures. Belle Vista resident Greg Premer told commissioners that the proposed platform “looks like a large garage” and that “nobody wanted this structure in front of our neighborhood.” He nonetheless acknowledged the broader benefit, saying the community is “taking one for the team for everybody down south of us.”

City staff responded by selecting a site that avoided roughly $160,000 in extra underground utility relocation costs. Residents also requested aesthetic improvements, such as wood‑look fencing, additional landscaping, and a monument sign at the entrance to Belle Vista Triangle Park. Mayor Scott Tate noted that a $30,000 request for these enhancements is “not unreasonable,” while Commissioner Jon Maldonado cautioned that public funds should prioritize core sewer functions over optional beautification.

At Fisherman’s Park, commissioners discussed ways to make the elevated generator less imposing in the limited waterfront space. Options such as decorative wraps or artwork from local artists were tabled, with the city agreeing to revisit the ideas next year without delaying the essential infrastructure work.

Balancing business access and safety

Lift Station 4, located at the end of 20th Avenue between The Wharf restaurant and Pass‑a‑Grille Marina, raised additional concerns about access for nearby businesses. The marina’s large mechanical boat lift leaves little room for maneuvering around the new equipment. City staff proposed removing fencing, adjusting a curb, and modifying a landscaped median to reduce collision risk. Maldonado, who met with marina representatives, supported the changes but emphasized that protecting the sewer system must remain the top priority.

“We do not want to do anything that’s going to impact or even put this station at risk,” Maldonado said, underscoring the importance of reliable wastewater service for hotels, restaurants, and other waterfront businesses that drive the local economy.

Looking ahead

The approved projects represent a proactive step by St. Pete Beach to safeguard its infrastructure against future hurricanes and storm surge. By elevating critical equipment and adding backup power, the city aims to prevent the complete standstill experienced after Hurricane Milton, when residents were instructed not to flush toilets, shower, or wash dishes.

Commissioners will revisit the Belle Vista beautification requests in June 2027, and the city will continue to explore community‑friendly design options for the Fisherman’s Park station. These efforts reflect a commitment to both resilient public works and the quality‑of‑life concerns of St. Pete Beach’s residents and businesses.


Original reporting: St. Pete Catalyst — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →