The Ada County Highway District (ACHD) confirmed that the long‑awaited Linder Road overpass project in Meridian has entered Phase Two. Phase One, which focused on preliminary work, is now complete, and the district is beginning construction of the overpass that will span Interstate 84 and connect Linder Road between Franklin and Overland.
Keeping Neighborhood Access Open
Residents expressed concerns that construction could cut off access to Franklin Avenue. ACHD spokesperson Matthew Chaney reassured the community, stating, “We’re requiring the contractor to keep both lanes open so we have the access open for them at all times.” This commitment aims to maintain traffic flow for nearby neighborhoods while the overpass is built.
No New Freeway Ramps Planned
The overpass will cross I‑84 without adding new freeway ramps. ACHD noted that the decision rests with the Idaho Transportation Department, explaining that an additional interchange between Ten Mile and Meridian could create further congestion on the interstate.
Benefits for Families and Students
For families traveling across the interstate to reach schools, the new connection promises a shorter commute. Chaney said, “It’ll be a lot easier for them to get their kids to school instead of going to Ten Mile or Meridian, so it cuts two miles out of their commute.” The reduced travel distance is expected to improve daily routines for many parents and students in the area.
Local Voices on the Project
Long‑time Meridian resident Kelty Forman, who grew up on Linder Road, shared mixed feelings about the construction. “My whole life I’ve lived on Linder Road when it’s just been like a small town and I’ve loved Meridian,” she said. Forman acknowledged the inconvenience of tree removal and limited neighborhood access, noting, “It’s kind of a pain to get into my neighborhood sometimes.” Yet she also expressed excitement about the long‑standing dream of a connected Linder Road, adding, “I’ve always dreamed of Linder Road being connected and now that it’s happening, I’m excited too.”
Project Timeline
ACHD projects that the overpass will be completed in the fall of 2027. The agency continues to monitor construction impacts and will provide updates as work progresses.
What Residents Can Expect
During Phase Two, drivers should anticipate typical construction activity such as lane shifts, signage, and occasional temporary slowdowns. ACHD encourages motorists to follow posted directions and remain patient as the district works to keep both lanes open and maintain safe travel conditions.
Overall, the Linder Road overpass represents a significant infrastructure investment for Meridian, aiming to improve connectivity, reduce commute times for families, and support the city’s continued growth while respecting the needs of existing neighborhoods.
Original reporting: KIVI Idaho News 6 Boise metro (local) — read the source article.