The Your
Oct 19, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Fresno County supervisors weigh Friant Ranch water plan amid drought concerns

Fresno County supervisors will meet Tuesday to consider approving the Friant Ranch master‑plan, a billion‑dollar project that aims to create a new town the size of Fowler just south of the community of Friant. The proposal hinges on a water‑supply assumption that the town can draw on a multi‑year reserve stored in Millerton Lake behind Friant Dam.

Federal agency says carry‑over limited to one year

David Hyatt, chief of the Bureau of Reclamation’s resource‑management division, told Fresnoland that the agency’s rescheduling guidelines allow Class 1 water – the type Friant Ranch depends on – to be carried over only for a single water year. “Under Reclamation’s Friant Division rescheduling guidelines, rescheduled Class 1 water cannot be carried over through multiple consecutive water years,” Hyatt wrote in an email.

County’s analysis relies on outdated data

The county’s only water‑supply assessment for the project dates back to 2008, predating the current storage scheme by eight years. A promised updated analysis was later dropped, with officials saying a new study was not technically required. Instead, the county has leaned on a 2022 memo from the developer’s consultant, which claims the project’s contracts “secure a reliable multi‑year surface water supply.”

Developer’s view versus federal reality

Bryan Wagner, a lawyer for Friant Ranch, maintains the town can “carry over double the amount we used in the prior year, which basically gives us a two‑year water supply.” The Bureau, however, reiterated that unused rescheduled water cannot be rescheduled again into a subsequent water year.

Historical context of water planning in the Valley

For decades, developers and farmers in the San Joaquin Valley relied on groundwater as a fallback during dry periods. Recent legislation, including the Sustainable Groundwater Management Act, now limits pumping and requires large subdivisions to demonstrate a water supply that can endure a multi‑year drought.

Past droughts highlight risks

Friant Ranch’s developers first raised concerns after the 2012‑2016 drought, when their primary source – Class 1 water from Millerton Lake secured through a 2011 agreement with the Lower Tule River Irrigation District – ran dry for two consecutive years. The developer then amended the deal in 2016, seeking to have the Bureau hold over twice the water each year to create a “two‑year water piggy bank.”

Engineering warnings ignored

An engineer from Provost & Pritchard, the firm that prepared the original water assessment, warned in a 2007 internal memo that Millerton Lake’s limited capacity and its flood‑control reservations left little room for multi‑year storage. The 2016 amendment was never signed off by the Bureau, and it is unclear whether the agency was consulted.

County’s missed oversight opportunities

In 2014, amid a severe drought, Fresno County announced it would revisit Friant Ranch’s water supply, promising an updated analysis. A later lawsuit narrowed the scope of the review, and by 2021 the county declared a new study “no longer necessary” because of the developer’s amended contracts. The county has since relied on the 2022 consultant memo, which expands the carry‑over claim to four years, despite the memo’s own disclaimer that it is not a comprehensive water‑supply assessment.

Potential impact on residents

If a multi‑year drought similar to 2014‑2015 were to recur, the town’s water supply could be jeopardized, leaving local officials scrambling for emergency sources for thousands of future residents. The county’s public works and communications offices did not respond to multiple requests for comment.

What’s next?

Supervisors will weigh the developer’s assurances against the Bureau’s clear limitation on water carry‑over. The outcome will determine whether Friant Ranch proceeds with its ambitious growth plan or must revisit its water‑supply strategy to ensure a reliable source for the community it hopes to build.


Original reporting: Fresnoland — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →