The Your
Nov 17, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Caldwell plans new turn lanes and signal upgrades at busy Linden‑Cleveland intersection

At a public meeting held Tuesday night in the Canyon County Fairgrounds, Caldwell residents and business owners gathered to review proposed changes to the congested intersection of Linden Street and Cleveland Boulevard. The open‑house format allowed neighbors to see design mock‑ups from DKS Associates, the engineering firm hired by the city, and to ask questions of project managers.

Community concerns and personal stories

Long‑time resident Tina Baney recounted a serious crash she witnessed about two and a half years ago involving an intoxicated driver with children in the back seat just down the block from the intersection. “It scared me so much I couldn’t go on and care for the man I was supposed to care for that day,” Baney said, emphasizing the personal impact of traffic safety in the area.

Neighbors also expressed frustration over past construction projects that they felt left the city’s main thoroughfares disrupted and communication lacking. Despite these worries, many agreed that the current layout is “crowded, inconvenient and sometimes downright dangerous.”

Data driving the redesign

The City of Caldwell reports that between 2019 and 2023, 50 crashes occurred near the Linden‑Cleveland intersection, 23 of which resulted in injuries. City officials anticipate continued traffic growth along Cleveland Boulevard as Caldwell expands.

In response, the city’s preliminary plan includes:

  • New right‑turn lanes on Linden Street to separate turning traffic from through traffic.
  • A center left‑turn lane to improve flow for vehicles heading east on Cleveland Boulevard.
  • An upgraded traffic signal with flashing pedestrian phases.
  • Median installations and additional pedestrian safety measures.
  • Conversion of certain business entrances to right‑in/right‑out access to reduce conflict points.

City traffic engineers project that these improvements could reduce the average evening rush‑hour wait at the intersection from about 58 seconds to roughly 34 seconds, a potential 24‑second gain for commuters.

Resident feedback on the design

Baney expressed optimism that the right‑turn lanes could make a difference, but she cautioned that the lanes might not be long enough to accommodate the volume of vehicles entering and exiting nearby businesses. “A lot of people will still be stuck in traffic wanting to turn right because the turn lanes aren’t long enough,” she said.

Other attendees asked about the timeline. City officials indicated that design work will continue into early 2027, with construction not expected to begin until 2028. Engineers told Idaho News 6 that a cost estimate is not yet available, as the project remains in the preliminary stage.

Looking ahead

City leaders emphasized that the proposed changes aim to protect lives and improve daily travel for Caldwell’s growing population. “Our goal is to make this intersection safer for drivers, pedestrians, and our local businesses,” a city spokesperson said.

Residents are encouraged to stay engaged through the city’s Facebook group, 2C Neighborhood News, for updates on the project and future public‑input opportunities.


Original reporting: KIVI Idaho News 6 Boise metro (local) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →