The Dallas‑Fort Worth metroplex is seeing a wave of transportation improvements that will benefit commuters, families, and local businesses. City officials in Plano, Allen, Richardson, Frisco and Fort Worth have detailed upcoming and ongoing projects aimed at repairing aging infrastructure, expanding road capacity, and enhancing pedestrian safety.
Plano: Park Boulevard concrete repair
The City of Plano will remove and reconstruct a concrete arterial street and sidewalk along Park Boulevard, stretching from US 75 to the eastern city limits. Bids opened in mid‑October, and construction is expected to begin in late November or early December, according to city officials. The project will modernize a heavily traveled corridor, improving both vehicle travel and pedestrian access for residents.
Allen: East Bethany Drive asphalt overlay
Allen’s public works department has awarded the construction contract for an asphalt overlay on East Bethany Drive to Overland Corporation. The overlay will add a protective layer over the existing pavement, extending the roadway’s lifespan and providing a smoother ride for drivers. City documents indicate the project will proceed shortly, reinforcing Allen’s commitment to maintaining safe, reliable streets.
Richardson: Richland Park Drive reconstruction
In Richardson, crews are reconstructing two segments of Richland Park Drive – from Sheffield Drive to Tiffany Trail and from Stillmeadow Drive to Wentworth Drive. The work includes rebuilding the roadway and replacing utility lines beneath it. Paving of the northbound travel lanes is ongoing, and utility installation continues, ensuring the street will meet modern standards for both traffic flow and underground services.
Frisco: Mahard Parkway construction
Frisco’s Mahard Parkway is under construction, extending from PGA Parkway to US 380 with a six‑lane configuration. The project borders the new Firefly Park development, providing improved access for future residents and businesses. Officials expect construction to wrap up later this year, delivering a major arterial route that will ease congestion and support growth in the area.
Fort Worth: Keller Hicks Road Phase 2
The second phase of Fort Worth’s Keller Hicks Road improvements adds a three‑lane section from Park Vista Boulevard to Lauren Way, along with new street lights, sidewalks, drainage upgrades, and a traffic signal at Woodland Springs Drive. The first phase, completed in spring 2025, covered the stretch from Lauren Way to US 377. During Phase 2, traffic is currently one‑way westbound, but two‑way traffic is expected to return by December 2026 once the final concrete lane and driveways are finished.
What these projects mean for residents
These transportation upgrades reflect a coordinated effort by local governments to address aging infrastructure, accommodate population growth, and enhance safety for drivers and pedestrians alike. By investing in concrete repairs, asphalt overlays, utility upgrades, and lane expansions, the cities are ensuring that the DFW region remains a vibrant place for families, businesses, and faith‑based communities to thrive.
Residents can expect reduced travel times, smoother road surfaces, and better lighting and drainage, all of which contribute to a higher quality of life. The projects also demonstrate responsible stewardship of taxpayer dollars, as each city has moved forward with transparent bidding processes and clear timelines.
Community members are encouraged to stay informed about construction schedules and detour routes through their city’s official websites or local news outlets. By working together, citizens and municipal leaders can keep the region’s roadways safe and efficient for years to come.
Original reporting: Community Impact — Plano — read the source article.