The City of Piqua confirmed that the ongoing improvement project on Washington Road will now stay closed through November 3. The extension gives contractors additional time to complete the final phases of the roadway upgrades, ensuring a safer and smoother thoroughfare for residents.
Detour Route and Driver Guidance
Drivers are instructed to use the designated detour that runs from Farrington Road to Stillwell Road, then onto Brown Road and South Street. Signage along the route will remain in place, and the city advises motorists to plan for longer drives while the construction crew finishes the work.
Project Details
M&T Excavating is handling the remaining construction tasks. The project includes resurfacing, drainage improvements, and updated traffic signals intended to reduce congestion and improve safety for both commuters and local businesses.
Impact on the Community
While the temporary inconvenience may cause longer travel times, the city emphasizes the long‑term benefits of the project. Residents can look forward to a more reliable road surface, better water runoff management, and enhanced visibility at intersections.
What Residents Should Do
- Follow the posted detour signs at all times.
- Allow extra time for trips that normally use Washington Road.
- Stay alert for construction vehicles and workers in the area.
- Report any unsafe conditions to the city’s public works department.
The city will continue to provide updates through its website and local news outlets. For real‑time alerts, residents can download the WHIO‑TV News app.
Looking Ahead
Once the construction is completed, Washington Road is expected to handle traffic more efficiently, supporting local commerce and daily commutes. The city thanks drivers for their patience and cooperation during this essential infrastructure upgrade.
Original reporting: WHIO-TV Dayton (local) — read the source article.