Woodland Park residents will notice smoother, safer travel after a trio of summer road projects wrapped up this month. The Colorado Department of Transportation (CDOT) completed a major upgrade on Highway 67, and the town finished two neighborhood repaving efforts on Fairview Avenue and Thunder Ridge Drive.
Highway 67 Expansion Improves Drainage and Capacity
CDOT crews began work on the north side of town in March 2025, targeting a two‑mile stretch of Highway 67 that had suffered from eroding open ditches and a narrow two‑lane configuration. The project replaced the open drainage ditches with underground infrastructure, eliminating the erosion that threatened private property and the roadway itself.
In addition to the new drainage system, the highway was widened from two lanes to four, with a shared center turn lane added to ease merging traffic. Pedestrian improvements, including new crosswalks and sidewalks, were also installed, providing safer options for walkers and cyclists.
Neighborhood Repaving Enhances Local Streets
Meanwhile, the town of Woodland Park turned its attention to two local streets. A half‑mile segment of Fairview Avenue, running from US 24 south to the town limits, was resurfaced with fresh asphalt, delivering a smoother ride for commuters and local businesses.
Thunder Ridge Drive, a steep, winding road north of Highway 67, presented a tougher challenge. Crews removed the historic cobblestone pavement that had become uneven and difficult to navigate, replacing it with modern asphalt. The new surface improves traction on the incline and reduces maintenance demands.
Benefits for Residents and Businesses
These improvements are expected to reduce travel times, lower vehicle wear, and enhance overall safety for drivers, pedestrians, and cyclists. Local business owners anticipate increased accessibility for customers, while families benefit from the reduced risk of flooding and property damage thanks to the upgraded drainage.
Mayor [Mayor’s Name] praised the collaborative effort, noting that the projects reflect Woodland Park’s commitment to maintaining reliable infrastructure that supports both the community’s daily needs and its long‑term growth.
Looking Ahead
Town officials say the successful completion of these projects sets a positive precedent for future public‑works initiatives. Ongoing coordination with CDOT and other state agencies will continue to ensure that Woodland Park’s roads remain safe, efficient, and ready to serve the community for years to come.
Original reporting: KRDO (Colorado Springs metro) — read the source article.