The Your
Sep 11, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Fort Wayne to Break Ground on Phase II of Lincolndale Flood Reduction Project

Fort Wayne, Indiana – City leaders, utilities officials, local business representatives and project partners are set to gather on Monday, Sept. 14, for a ceremonial groundbreaking of Phase II of the Lincolndale Drain Wetlands and Bank Stabilization Project. The event, scheduled for 11:30 a.m. at the rear drive of the NAPA Distribution Center (2000 W. Coliseum Blvd.), marks the next step in a multi‑year effort to address persistent flooding along the Lincolndale Drain corridor.

Project details and goals

The Phase II work focuses on improving drainage and reducing flood risk in the area surrounding Executive Boulevard and Production Road, a stretch that has experienced repeated water‑related disruptions for residents and businesses. Central to the plan is a new stormwater detention basin capable of holding roughly three million gallons of water. By temporarily storing runoff during heavy rains, the basin will lessen the volume and speed of water flowing downstream, helping to protect homes, roads and commercial properties.

In addition to the basin, the project includes extensive native and wetland plantings along the Lincolndale Drain. These plantings are designed to stabilize the banks, filter pollutants, and create additional habitat for local wildlife. City officials emphasize that the ecological benefits—improved water quality and expanded habitat—are integral to the overall mission of the project.

Community and economic impact

City Utilities and elected officials note that the flood‑reduction measures are expected to provide long‑term economic stability for the area. By mitigating flood damage, the city hopes to reduce repair costs for homeowners and businesses, encourage investment, and support the continued growth of the Interstate Industrial Park and surrounding neighborhoods.

Local business leaders attending the ceremony expressed optimism that the improved infrastructure will make the area more attractive for future development while preserving the natural character of the wetlands.

Next steps

Construction of the detention basin and associated plantings is slated to begin shortly after the groundbreaking. The city will provide regular updates on project milestones, including anticipated completion dates and any temporary traffic adjustments required during construction.

Fort Wayne’s commitment to resilient infrastructure reflects a broader focus on protecting the community’s safety, property and environment. The Lincolndale Drain project is one of several initiatives the city is pursuing to strengthen its water management systems and safeguard residents against the increasing challenges posed by severe weather events.

For more information about the project timeline, public meetings or ways to stay involved, residents can visit the City of Fort Wayne’s official website or contact the City Utilities Department.


Original reporting: WOWO News/Talk (Fort Wayne) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →