The Your
Nov 24, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Farmers Branch Council Considers Pedestrian Safety Upgrades After Engineer Flags Critical Crossing

Farmers Branch city leaders are weighing a set of pedestrian‑safety improvements after traffic engineer Karl Rothermel of Cobb, Fendley & Associates identified the Valley View Lane and Rawhide Drive crossing as a critical safety concern. Rothermel told council members that two pedestrian‑involved crashes occurred at the six‑lane intersection near Oran Good Park and the city’s rose garden within the past year.

Study ranks crossing last despite safety concerns

The September citywide improvement study evaluated 24 locations and placed the Rawhide crossing at the bottom of the list. The ranking reflects a formula that weighs traffic delays, pedestrian and bicycle activity, accessibility, and construction costs more heavily than crash history alone. While the study recorded two crashes at Rawhide, it did not confirm whether those incidents involved pedestrians, a point the mayor and council members pressed for clarification.

Engineer recommends hybrid beacons and stronger signals

Rothermel recommended installing pedestrian‑activated hybrid beacons at both the Rawhide site and a second location on Valley View Lane near Marsh Lane, which serves an auxiliary parking lot for the police station and municipal court. The existing flashing warning lights at Rawhide would be replaced with red‑light signals that require drivers to stop, a change the engineer says would better protect pedestrians, especially given nearby DART transit stops.

Funding timeline and council questions

The study estimates $291,236 for the Rawhide upgrades, but the written plan places the project in a six‑to‑ten‑year funding window. Rothermel, however, listed the crossing among seven sites he believes merit earlier action. Council Member Roger Neal asked whether the study accounted for seasonal pedestrian traffic, noting that traffic counts were taken only in February and April while schools were in session. Rothermel explained that no summer counts were conducted.

Mayor Terry Lynne raised the possibility of legal liability if another crash occurs after officials have been warned of the danger. “We’re on notice now,” Lynne said, questioning whether the city should act within 90 days, six months, or a longer period.

Broader citywide improvement plan

The overall citywide pedestrian‑improvement program is budgeted at roughly $3.7 million, covering new signals, crosswalks, and sidewalk repairs. Seven intersections have been earmarked for near‑term work at an estimated cost of $1.45 million. Those projects include Valley View Lane at Josey Lane, Marsh Lane, Alpha Road, Goodland Street, Josey Lane at Villa Creek Drive, Pebble Beach Drive at Marsh Lane, and Bee Street at Farmers Branch Lane.

At Valley View Lane and Alpha Road, engineers found no crosswalks, curb ramps, or pedestrian signals, earning the lowest accessibility rating in the report. Crash records for the 24 locations show 151 collisions over three years, with the highest counts at Valley View Lane and Josey Lane (39 crashes) and Valley View Lane and Marsh Lane (32 crashes).

Next steps and community input

City staff indicated that the first seven projects will be bundled into a single construction package to achieve better pricing. Council Member Tina Bennett‑Burton asked whether the initial work could be completed in 2027, with subsequent phases in 2028 and 2029. Staff responded that later phases will return to council for budget discussion.

Council Member Elizabeth Villafranca questioned why Marsh Lane at Wooded Creek was omitted from the study, citing a prior fatal crash. Rothermel said the intersection was not evaluated and could not confirm whether the city had addressed safety concerns there.

No construction approvals were issued during the November 17 study session, and no firm schedule was announced. The city plans to move the first projects into engineering design, with remaining improvements dependent on future funding decisions.

Farmers Branch residents who rely on these crossings for daily commutes, school runs, and DART trips will be watching closely as the council balances safety priorities with budget constraints. The council’s ongoing dialogue reflects a commitment to protect pedestrians while managing the city’s long‑term infrastructure needs.


Original reporting: Branch Herald (Carrollton / Farmers Branch, local news) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →