According to griceconnect.com, the Port of Savannah handled 565,366 twenty‑foot equivalent units (TEUs) in October, marking a 25 % increase over October 2025 and representing the second‑highest monthly TEU total in Georgia Ports’ history. The surge reflects strong consumer spending and an extended peak shipping season, factors that directly affect Savannah residents who rely on timely deliveries for holiday shopping and e‑commerce orders.
The same source reported that fiscal year‑to‑date 2027 volumes were up 7.8 % (152,991 TEUs) and that 160 vessels called at the port in October, a 5 % rise over the same month last year. These figures underscore the port’s growing role as a gateway for goods moving through the Southeast.
“Our container volumes are driven by strong consumer spending, an extended peak shipping season and our port and inland infrastructure ease of use,” said Griff Lynch, CEO of the Georgia Ports Authority. Kevin Price, President of the Authority, added that “we’re seeing ocean carriers return to Suez Canal routings which translate to 10‑12 day transit improvements to Savannah supply‑chain inventory and fulfillment speeds, which is always welcome at this time of year with holiday sales and ecommerce ordering.” Alec Poitevint, Chairman of the Authority, highlighted the broader impact, noting, “The State of Georgia’s ability to attract Audi’s future manufacturing plant shows how our high‑performance ports and inland connectivity support the Peach State and Southeast region’s long‑term growth.”
On October 14, Georgia Ports announced a $2.3 billion infrastructure investment, approved by the U.S. Army Corps of Engineers, to build the Savannah Container Terminal. The planned 3.5‑million‑TEU facility will sit on 350 acres, feature on‑dock rail, and include a dedicated truck entrance and exit to a highway. Construction is slated to begin in 2028, and when completed, the terminal will raise the Port of Savannah’s total capacity to 12 million TEUs.
In parallel, a $1.6 billion renovation of the Ocean Terminal is more than 60 % complete. Once finished, the terminal’s capacity will rise from 200,000 TEUs to 1.75 million TEUs, and truck gate construction is 99 % complete, further streamlining cargo movement.
The Authority is also working with the U.S. Army Corps of Engineers on a study under Section 203 of the Water Resources Development Act to consider deepening the Savannah channel and adding passing lanes for two‑way ship traffic. Meanwhile, the Panama Canal Authority announced on November 12 that daily vessel transits will increase from 33 to 34 and the maximum allowable draft at the Neo‑Panamax locks will rise from 49 to 50 feet, offering additional flexibility for ships bound for Savannah.
Governor Brian Kemp and industry partners attended the official opening ceremony for the Gainesville Inland Port on November 10. The inland facility, located an hour north of Atlanta, is positioned to support high‑growth manufacturing and distribution for more than 330 companies.
What’s next: Construction of the Savannah Container Terminal is set to start in 2028, with the deepening and passing‑lane study expected to release recommendations later this year. Port officials anticipate that the expanded capacity and improved channel will further reduce transit times, supporting local businesses and consumers as holiday demand peaks.
Sources: griceconnect.com