Spearfish residents will see crack‑sealing crews on the streets beginning Nov. 30 through Dec. 4. The city’s Public Works Department announced the schedule after weather‑related delays pushed the work back from its original timeline.
What the project entails
The crack‑sealing operation will target a number of key thoroughfares, including the main routes that connect downtown Spearfish to surrounding neighborhoods. If materials and funding allow, crews may also treat cracks on Duke Parkway between U.S. Highway 85 and Brooks Loop.
All work will be performed during daylight hours. Mobile traffic‑control vehicles will be on site to manage limited lane closures, and motorists are asked to obey posted signs, reduce speed, and use caution in the work zones.
Safety reminders for drivers
The city warned that fresh oil and dust may be present on newly sealed surfaces. Drivers are encouraged to avoid driving over the freshly sealed cracks when possible, as the residue can be slippery until it fully sets.
Spearfish Public Works emphasized that the temporary inconvenience is a small price to pay for longer‑lasting road conditions. Properly sealed cracks help prevent water infiltration, pothole formation, and costly future repairs, ultimately preserving the safety and smoothness of the city’s road network.
Contact information
For additional details or to report any concerns during the project, residents can contact the Spearfish Public Works Department at 605‑642‑1333. The department will continue to provide updates as the work progresses.
Spearfish officials thank drivers for their patience and cooperation as the city works to maintain safe, reliable streets for families, commuters, and visitors alike.
Original reporting: KOTA (Gray) – local — read the source article.