Tesla opened its first Texas Megacharger in Mesquite on November 17, 2026, providing eight dedicated charging stalls for Tesla Semi trucks, according to teslanorth.com. The new facility is listed on Tesla’s public charging map and is described as a truck‑only Megacharger, distinct from the company’s passenger‑car Superchargers.
The company’s Semi account confirmed the milestone, citing a Tesla Charging announcement that read, “We’re rapidly scaling charging & service for Semi in the state.” The tweet was posted by the official Tesla Semi Twitter account on the same day.
This opening follows Tesla’s broader push to expand its truck‑charging and service network across Texas. The firm previously announced a November 12 opening event for its Laredo Semi Service Center, and the Mesquite site adds a charging location to that effort, though Tesla has not released a complete schedule for additional Texas sites.
Nationally, Tesla recently rolled out a six‑stall Megacharger in Hodgkins, Illinois, and an eight‑stall facility in Conley, Georgia. The hardware, built around a V4 cabinet with two charging posts, is rated for up to 1.2 megawatts per post, representing the peak capability of the system.
For commercial fleets, the addition of both charging and service coverage is critical. A reliable charging point along a route reduces downtime, while nearby service centers can shorten the distance trucks must travel for maintenance and repairs, supporting more efficient operations.
Details such as charging prices, operating hours, and which fleets will initially use the Mesquite Megacharger have not been disclosed by Tesla. For now, the confirmed information is the presence of eight charging stalls at the first Texas location, marking a significant step in the company’s effort to build a statewide network for its Semi trucks.
Sources: teslanorth.com