The Your
Nov 12, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Cascade Township to Build Dedicated Pedestrian Overpass Over I‑96

Cascade Township officials announced plans for a new pedestrian overpass that will span Interstate 96, providing a dedicated crossing for cyclists and walkers separate from vehicle traffic. The bridge is intended to close a gap in West Michigan’s trail network, allowing residents to travel more safely between Cascade Township and the neighboring community of Kentwood.

Project details and funding

The township will construct the new bridge alongside the existing Burton Street bridge, which currently carries vehicle traffic but is too narrow for comfortable shared use by pedestrians and cyclists. State funding of $3.5 million, earmarked specifically for the pedestrian crossing, will cover the majority of construction costs.

Safety and connectivity benefits

Local cyclists welcome the proposal. Kevin Cusack, a Forest Hills rider who serves on the board of West Michigan Trails, said the narrow Burton Street bridge forces cyclists onto a cramped roadway. “That’s a very narrow bridge, and anything we can do to eliminate bikes on very narrow spaces, I’m very much in favor of it,” Cusack explained.

Supervisor Grace Lesperance highlighted the broader goal of expanding pathway connections. “Connectivity is huge. People love the pathways, and getting over the expressway really gives people a great option to go even further and connect with other communities,” she said.

Construction timeline and traffic impact

Construction is expected to take four to five months, though the schedule could shift as the project moves through the Michigan Department of Transportation’s permitting process. While the new bridge will be built separately from the existing structure, officials anticipate temporary lane shifts on I‑96 and a possible single‑night closure to install the prefabricated span. Impacts along Burton Street are expected to be minimal.

Officials say construction could begin as early as 2027, but an official start date has not yet been set.

Looking ahead

The overpass is part of a larger effort to link West Michigan’s trail system, which currently contains many disconnected segments. Cusack noted, “We have a lot of trails, unfortunately, that don’t connect, and we need to make connections.” He hopes that additional projects like the Burton Street overpass will eventually allow cyclists and pedestrians to travel farther without being forced onto busy roads.

By providing a safe, dedicated crossing, the township aims to encourage more active transportation, support healthy lifestyles, and strengthen ties between neighboring communities.


Original reporting: FOX 17 WXMI Grand Rapids (local) — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →