At a recent City Council study session, city engineer Thomas Morneau outlined a proposed overhaul of the parking lot at the Hub on Smith. The project, which the council will consider awarding soon, aims to replace the existing concrete surface and islands with a new, level lot that improves drainage, meets ADA requirements, and eliminates the current grade break.
Project scope and improvements
According to Morneau, the phased construction will begin with demolition of the old concrete and removal of the islands that currently disrupt traffic flow. A new pavement will be installed, providing a smoother, more functional surface for visitors to the Hub. The design also incorporates enhanced site drainage to prevent water pooling, a common complaint from users during rainstorms.
In addition to the paving work, the plan includes upgrades to essential utilities. New water and sewer lines will be run beneath the lot, along with updated electrical service. A modern grease trap will be installed to better manage waste from nearby food vendors, ensuring compliance with health and environmental standards.
Benefits for the community
The Hub on Smith serves as a gathering point for local events, markets, and community activities. By creating a more accessible and reliable parking area, the city hopes to encourage greater attendance at these events and support local businesses that rely on foot traffic. The ADA‑compliant design will also make the site more welcoming for families, seniors, and individuals with mobility challenges.
“We’re making this site more functional for the users that are going and attending the Hub,” Morneau said, emphasizing the project’s focus on everyday convenience for Sheridan residents.
Next steps
The council is expected to vote on the bid award in the coming weeks. If approved, construction will proceed in phases to minimize disruption to current users of the Hub. City officials will provide updates on timelines and any temporary parking arrangements needed during the work.
Local business owners and community members have been invited to submit comments during the public comment period, ensuring that the project reflects the needs and concerns of those who rely on the Hub for commerce and recreation.
Original reporting: Sheridan Media (Sheridan WY) — read the source article.