Rogersville, Mo. – The Ozarks Transportation Organization (OTO) is gathering feedback from residents and business owners on a proposed redesign of the U.S. 60 and U.S. 65 corridor that runs through the community. At a Tuesday meeting, OTO presented several conceptual layouts and asked participants to weigh in on safety, travel‑time reliability and the impact on local property access.
Safety and traffic concerns drive the study
“We are looking at the 60, 65 area in a broader sense, trying to look at the connectivity as a whole for the region,” said Sara Fields, OTO’s Executive Director. “How we can improve safety, how we can enhance access as well as travel‑time reliability and congestion.”
Fields noted that the stretch of Highway 60 sees a high volume of crashes and frequent traffic backups. “There aren’t enough gaps in traffic to allow people to pull onto the road,” she explained. “Consolidating some of that access – especially at certain farm roads – could reduce the number of collisions.”
Local business worries about reduced access
Brian VanFossen, president of Citizens Bank of Rogersville, voiced concerns that past OTO concepts would have cut off direct access to his branch on Farm Road 189. “People would have to travel down and get off two miles before they get to our location, and that would just be a situation where people would drive right by,” VanFossen said. “There’s too much other competition.”
VanFossen urged OTO to preserve convenient entry points for businesses and residents. “I’d like to see something that would give access right here, either Highland Springs or Farm Road 189, to give access off U.S. 60. That would spur growth and protect the economic viability of the undeveloped land around us.”
Proposed design options
During the meeting, OTO displayed mock‑ups that ranged from modest access consolidations to larger concepts such as a new interchange or a collector road. Fields emphasized that the plans are still in an early stage. “Right now we sort of threw everything at the wall to see what even could fit and what ideas were,” she said. “We still have to go back and do traffic analysis to make sure it will work.”
The organization expects to refine the study and release an updated plan by the end of spring or early summer 2027, after incorporating public comments and completing engineering analyses.
Community response and next steps
Attendees expressed a mix of support for improved safety and caution about limiting access to farm roads that serve local farms and businesses. Many echoed Fields’ sentiment that a balanced approach—reducing crash risk while preserving essential connectivity—could benefit both drivers and the local economy.
OTO invited anyone who could not attend the meeting to submit written comments via its website or by contacting the organization directly. The agency plans to hold additional public forums later in the year to keep the conversation ongoing.
For more information on upcoming meetings or to review the design concepts, residents can visit OTO’s website or call the office at (555) 123‑4567.
Original reporting: KY3 Springfield (local) — read the source article.