The Your
Nov 07, 2026
HyperLocal Loop
The Your

Close to home. Always in the loop.

Fort Worth to Upgrade Storm Drainage on Northside Drive off I‑35W

Fort Worth officials announced a $1.8 million upgrade to the storm‑drain system on Northside Drive, just off Interstate 35W. The project, part of the city’s Stormwater Management Program, is intended to curb roadway overtopping during heavy rain and improve safety for motorists and nearby residents.

Project details and timeline

According to the public meeting held on Oct. 29, the work will begin in January 2027 and is expected to be completed by the summer of that year. Rebcon, the contracted construction firm, will handle the installation of new drainage infrastructure, including larger culverts and upgraded catch basins designed to move water more efficiently.

Impact on traffic

City engineers warned that the construction will cause temporary traffic delays along the corridor, which is a heavily used route for commuters traveling between downtown Fort Worth and the northern suburbs. Motorists are advised to follow posted signage, allow extra travel time, and consider alternative routes during the construction window.

Why the improvements matter

Fort Worth’s storm‑water system has faced increasing strain as the region experiences more frequent intense rain events. The new drainage upgrades aim to reduce the risk of water spilling onto the roadway, which can lead to hazardous driving conditions, vehicle damage, and delayed emergency response. By addressing these vulnerabilities, the city hopes to protect both drivers and nearby properties from flood‑related damage.

Community response

Residents and business owners in the Northside Drive area expressed mixed reactions at the meeting. While many welcomed the safety benefits, some voiced concerns about the anticipated traffic disruptions and the length of the construction period. City officials emphasized that the short‑term inconvenience is outweighed by the long‑term reduction in flooding and the associated safety improvements.

Funding and oversight

The $1.8 million budget for the project is funded through the city’s Stormwater Management Program, which allocates resources for infrastructure upgrades that mitigate flood risk. The program is overseen by the Fort Worth Public Works Department, which monitors progress and ensures compliance with state and local regulations.

What’s next

Fort Worth will continue to update the public on construction milestones and any changes to traffic patterns through its website and local news outlets. Motorists are encouraged to stay informed and plan accordingly to minimize inconvenience. The city’s commitment to modernizing its storm‑water infrastructure reflects a broader effort to safeguard the community against the growing challenges posed by climate‑related weather events.


Original reporting: Fort Worth Report — read the source article.

OBBM Network Editorial Staff

[email protected]

Editorial team behind OBBM Network — independent, hyper-local journalism syndicated through HyperLocalLoop and OBBM Network TV.

Leave a Reply

Your email address will not be published. Required fields are marked *

Recent News

Trending

Community News

Quick Start Deal

Turn Local Reach Into Real Leads

A monthly bundle that puts your business in front of local audiences across HyperLocal Loop and the OBBM Network — and delivers ready-to-contact buyers to your team.

$500 Per Month
What's Included
  • LeadEngine · 1,000 Contacts Verified, buyer-intent prospects in your market, delivered to your team
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads · 3 Cities Geo-targeted display placement across HyperLocal Loop in three cities
  • Video Commercial · 3 Cities Your commercial airs on the local OBBM channel in three cities
  • Audio · 10,000 Impressions Podcast ad impressions across the OBBM Network
  • Geo-Targeting City or regional targeting via AdServe
  • Real-Time Reporting Track campaign performance as it happens
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
Quick Start Deal

Get Loop-Ready in One Move

A low-commitment monthly bundle that keeps your business in front of local audiences across HyperLocal Loop and the OBBM Network.

$350 Per Month
What's Included
  • DataPulse · 1,000 Matches Identify and retarget anonymous visitors to your site
  • Banner Ads Geo-targeted display placement across HyperLocal Loop
  • Video Ad Airs on your Local OBBM Channel
  • Business Advertorial A featured sponsored article telling your story
Questions about any of this? Ask Ben →
Get Started
Secure checkout · Cancel anytime
§ 04 · Choose Your Package

Three levels. Up to 60% off.

Every Patriot Package is priced at over 40% off standard AdRevv list rates — and the discount deepens as you scale, up to 60% off at the Enterprise tier.

Tier I · Local
The Patriot
For local & regional brands launching with the network.
List Price: $835/mo
$500/mo
★ Save $335 — 40% Off
Monthly Allotment
  • Audio: 10,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 50,000HyperLocal Loop geo-targeted banner impressions
  • DataPulse: First 1,000visitor matches included
  • City or regional geo-targeting via AdServe
  • Real-time campaign reporting
Start The Patriot
Tier III · National
The Enterprise
For national brands ready to dominate the network.
List Price: $5,065/mo
$2026/mo
★ Save $3,039 — 60% Off
Monthly Allotment
  • Audio: 14,000Podcast impressions
  • Video: 10,000Streaming TV impressions
  • Banners: 100,000HyperLocal Loop geo-targeted impressions
  • DataPulse: 5,000visitor matches included
  • LeadEngine: 20,000actionable buyer-intent contacts
  • Host Endorsements: 9podcast host-read spots
  • National geo-targeting + dedicated campaign manager
  • Priority creative production support
★ Bonus Included ★
Free 1-Year Freedom Chamber Membership
Faith, Family & Freedom business community at freedomchamber.net.
Start Enterprise

Need a custom configuration? Build your own package →